Strong plastic nail for fastening insulation boards in concrete.
Plastic coupling for combination of tie rod sleeves and fibre-reinforced concrete tubes. Suitable for tubes with Ø 22 mm.
Cast iron tie bar connector for tie rods with DYWIDAG thread 15 mm. For the force-fit connection of two tie rods.
Closed water barrier made of cast iron for tie rods with DYWIDAG thread 15 mm. For making watertight clamping points in combination with the coupling (DIKUW22N) for tie rod sleeves Ø 22 mm.
The ribbed expanded metal made of galvanised sheet steel is used as permanent formwork. Due to the rib height of approx. 21 mm and the special profiling, it is extremely strong and ensures a perfect bond of the construction joints.
Wood screw according to DIN 571, Ø 12 x 70 mm for use with Hohlwanddübel "K" (Item No. HWD12) and Ø 12 x 80 mm for use with Hohlwanddübel "M" (Item No. HWDM12).
Hohlwanddübel-Plus for temporary fastening of props and corner brackets to solid walls in the assembly state. The Hohlwanddübel-Plus is positioned on the formwork at the factory using hot glue. Best possible hold due to roughened adhesive surface with Ø 50 mm. A small recess in the adhesive plate ensures minimum consumption of hot glue. Alternatively, the Hohlwanddübel can be attached to steel formwork tables with an adhesive pad (double-sided adhesive on carrier foil). Positive side effect: No more hot glue runs into the screw guide! Only the approved MULTI-MONTI®-plus SSK 16 x 90 mm concrete screw may be used for attaching the prop to the Hohlwanddübel-Plus. The adhesive plate can be easily removed through a predetermined breaking point. Supplied without screw.
Mounting set with accessories for on-site assembly of solid and double walls. Standard mounting set consisting of: - 30 MULTI-MONTI®-plus SSK 16 x 130 mm screws - 60 each of UP02, UP03, UP05, UP10, UP20 leveling shims Customised mounting sets on request.
Magnet for mounting the Hohlwanddübel-PLUS "M" (Item No. HWDPM16) or Hohlwanddübels-PLUS Massivwand "M" (Item No. HWDPMMW16) on steel formwork.
FORMWORK TUBE NEVOTUBE® “RECHTECK“ Flexibility: Every producible dimension available within 2 to 3 working days. Delivered to construction site in customised lengths. Lengths of up to 12.5 m have already been realised. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. Resistant to direct exposure to moisture. No horizontal joints of the inner liner up to a length of 4 m. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a knife. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.
FORMWORK TUBE NEVOTUBE® “QUADRAT“ Flexibility: Any dimension from 150x150 mm to 800x800 mm available within 2 to 3 working days. Delivered to construction site in customised lengths. Lengths of up to 12.5 m have already been realised. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. Resistant to direct exposure to moisture. No horizontal joints of the inner liner up to a length of 4 m. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a knife. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.
FORMWORK TUBE MONOTUB RUND "SPIRAL" Flexibility: Any dimension from Ø 150 mm to Ø 1,200 mm and any length available within 2 to 3 working days. Delivered to construction site in customised lengths. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. 100% waterproof, therefore outdoor storage and installation possible in all weather conditions. With formwork pipes from Ø 650 mm, 2 vertical joints of the PVC insert are visible. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a ripcord. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.